Skip to content

Ring deployment

Update a few devices first, check they are fine, then update the rest. How VelaOS rolls an OS update out in rings, and how to set it up.

A ring deployment updates a small share of your devices first, waits, checks that they started the new version without problems, and only then updates the next, larger share. If too many devices fail, the rollout stops before it reaches the rest of your fleet. VelaOS does this for every operating system (OS) update you start from the console. This guide covers OS image rollouts.

What are the rings?

VelaOS uses three rings, always in this order:

  • Test: gets the update first. A few devices.
  • Pilot: gets it next, once Test is fine. A sample of your fleet.
  • Production: everyone else, once Pilot is fine.

Each device keeps two copies of the system. An update installs into the spare copy and takes effect at the next restart. If the new copy fails its health checks after the restart, the device goes back to the previous copy by itself. A device only counts as updated once it reports that it started the new image.

What are the sizes and wait times?

How a ring rollout moves from ring to ring
RuleValue
Test ring size5% of the devices in the rollout (you can choose 1–50% when you start it)
Pilot ring size25% of the devices, the Test ring included
Production ringEvery device in the rollout
Wait before Pilot startsAt least 30 minutes after the Test ring started
Wait before Production startsAt least 2 hours after the Pilot ring started
Needed to move on95% of the ring's devices updated
Rollout halts whenMore than 5% of the devices failed, or more than 10% rolled back
Time for one device20 minutes from its restart to a healthy start; after that it counts as failed
Offline devicesSkipped after 48 hours offline, so they don't hold up the rollout

Which devices land in the Test and Pilot rings is a fixed pick per rollout: each ring holds the devices of the ring before it, plus more. Only the Test ring size can be changed when you start a rollout. The wait times and the 95% bar are the same for every rollout and can't be changed yet.

When a Test or Pilot ring finishes below 95% but under the halt limits, the rollout pauses. You can resume it, which moves on to the next ring, or abort it. A Production ring that finishes below 95% completes; it doesn't pause.

How do you start a ring rollout?

You need a role that can deploy updates, and your devices in at least one group.

For one device or a few, you don't need a group: select them in Devices and choose Update OS to pick a release. A small selection updates together; a larger one still goes in waves that stop on failures.

  1. 1

    Open OS images

    In the console, open Updates → OS images and choose Update OS.

  2. 2

    Choose the image

    Enter the OS image: registry, image name and tag. The console turns the tag into a fixed digest, so every ring gets exactly the same image even if the tag moves later.

  3. 3

    Choose the groups

    Tick the groups whose devices get the update.

  4. 4

    Keep the rings on

    Under Rollout waves, leave Test, then Pilot, then Production selected and set the Test ring size in percent of devices. The other choice, All devices at once, is only shown to people who may use the emergency stop and is meant for urgent fixes.

  5. 5

    Optional: a maintenance window

    Tick Only update inside a maintenance window and choose the hours and days. The hours are in your browser's time zone. Devices start their update only inside the window.

  6. 6

    Optional: ask people to restart

    Tick Ask users to restart to let the person at each device restart now or later, with a deadline after which the device restarts by itself. Without it, devices switch to the new version at their next restart.

  7. 7

    Review and start

    Check the summary and start the rollout. Progress shows on the same page: the current ring, how many devices have updated and how many failed. Choose Devices on a rollout to see each device.

Can you choose which devices are in the Test ring?

Yes, in a second way. Every device has an update ring: Test, Pilot or Production (the default). Set it for a whole group on the Groups page, or for single devices with Change update ring on the Devices page. The Devices list can be filtered by update ring.

In the Update OS dialog, Update rings limits the rollout to devices in the rings you tick. To update your hand-picked devices in order, start one rollout for the Test ring, check the result, then start one for Pilot, then one for Production. Each of those rollouts still moves through its own percentage rings as described above.

Good devices for the Test ring

Pick devices that cover your hardware models and the apps you run, and that someone in IT uses or can reach quickly. A Test ring that has none of your common models tells you little.

How do you stop a rollout?

  • Emergency stop (top bar of the console, for people with that permission): no new update commands go out to any device in your organisation. Devices already updating finish. Rollouts carry on when you lift the stop.
  • Halted rollouts stay halted. Find out why on the rollout's device list, fix the cause, then start a new rollout.
  • Paused rollouts are resumed or aborted with the API. The console has no button for this yet.
bash
# Resume a paused rollout (moves on to the next ring)
curl -X POST "$VELA_API_URL/api/v1/rollouts/ROLLOUT_ID/resume" \
  -H "X-API-Key: $VELA_API_KEY"

# Or abort it
curl -X POST "$VELA_API_URL/api/v1/rollouts/ROLLOUT_ID/abort" \
  -H "X-API-Key: $VELA_API_KEY"

The API key needs the apps:deploy scope. Create keys under Settings → API keys. Set VELA_API_URL to the API address from the OpenAPI description (sign in to read it), without /api/v1.

Was this helpful?
Updated 13 November 2026